INSTALLATION OF THE FITTING OF DISPIPE ON THE CORROSION-PROOF CORRUGATED TUBE
1. It is cut accurately off the necessary length of a tube. We check a tube edge; it has to be equal, without agnails |
![]() |
2. We turn off a nut from the case of a fitting and we put on it a tube.
. |
![]() |
3. It is accurately unclenched the fixing ring and we put on it a tube (through a tube end face), on the third wave corrugations. |
![]() ![]() |
4. We put a tube on a clamping ring and a silicone sealant.
. |
![]() |
5. We insert a tube into the case of a fitting and we tighten a cap nut.
|
![]() ![]() |